Skip navigation

Home Mott MacDonald at Heathrow Terminal 5 Infrastructure Services at Terminal 5 Cross-linked projects Careers Contact us
 
Search




Browse


Airports Rail Surface access BAA Road User Charging Study Heathrow East Terminal Heathrow Terminal Masterplan Sustainable Development at Heathrow Urban Traffic Control
 

Urban Traffic Control - Heathrow Airport Northern Perimeter Road

Mott MacDonald has been providing the detailed traffic signal junction design for four junctions along the Northern Perimeter Road.


Project delivery includes the following:
  • Positioning of vehicle detection equipment
  • Establishment of a communications link to the existing UTC network
  • Signal modelling of the four junctions
  • Provision of traffic signal controller specification for each junction
  • Creation of a scope of works to be undertaken by the contractor
  • Attendance at factory acceptance tests and site acceptance tests
  • Attendance at commissioning on behalf of BAA
  • Incorporation of the four junctions into the current UTC/SCOOT system
  • Validation of SCOOT data, traffic signal controller operations and timings


© Mott MacDonald Group 2008
Site by Mott MacDonald and Radley Yeldar ›