As one of BAA’s first-tier integrated suppliers, Mott MacDonald
has been the design engineer for all the
£4.3 billion project’s sub-structures and foundations.
We’ve been responsible for development, co-ordination and design of
all substructures including the multilevel basements beneath the
main terminal, concourse A and B, over and outside roads and all
geotechnical design associated with the close proximity of
underground tunnels. Other substructures we’ve worked on include
taxiway bridges for aircraft over airside roads, concrete
underground structures for the track transit and baggage systems as
well as underground service tunnels and airside roads.
Among the tasks undertaken is the 1.7km long Piccadilly Line
extension, which connects into the existing Piccadilly Line near
the central terminal area. Similarly, the Heathrow Express
Extension takes the Heathrow Express rail link from the existing
rail station at the central terminal area
to the new rail station located beneath the new terminal building.